• Page title image

General Circulars

Home/ Notice Board/ Circulars/ General Circular

Filter

  • The revised fare Stages of Route NO.803 on experimental basis
    Date: 31-12-2013 | 14.28 KB
    Download
  • The revised fare Stage of Route NO. 0926
    Date: 31-12-2013 | 14.28 KB
    Download
  • The revised fare Stage of Route NO. 0926
    Date: 31-12-2013 | 14.28 KB
    Download
  • Modified The revised fare Stages of Route NO. 323
    Date: 27-12-2013 | 1.57 MB
    Download
  • The Fare Stages of Route No. 615B on experimental basis
    Date: 17-12-2013 | 587.48 KB
    Download
  • The fare Stage of route NO. 621 on experimental basis
    Date: 17-12-2013 | 565.63 KB
    Download
  • The fare Stage of route NO. 621 on experimental basis
    Date: 17-12-2013 | 565.63 KB
    Download
  • The Revised fare Stage of Route NO. 307A
    Date: 17-12-2013 | 535.48 KB
    Download
  • Fare stage of Expended Route No. 841
    Date: 17-12-2013 | 556.81 KB
    Download
  • The Revised fare Stage of Route NO. 307A
    Date: 17-12-2013 | 535.48 KB
    Download
  • The Fare Stages of Route No. 615B on experimental basis
    Date: 17-12-2013 | 587.48 KB
    Download
  • Prevention of incident of Eve-teasing in DTC Buses
    Date: 03-12-2013 | 389.4 KB
    Download
  • Deployment of workshop staff in control room for lodging the defect report
    Date: 28-11-2013 | 779.45 KB
    Download
  • The revised fare stage of Route NO. 817 on experimental basis w.e.f. 14.11.2013. letter NO.3561 dt. 18.11.2013
    Date: 18-11-2013 | 250.23 KB
    Download
  • The revised fare stage of Route NO. 817 on experimental basis w.e.f. 14.11.2013. letter NO.3561 dt. 18.11.2013
    Date: 18-11-2013 | 250.23 KB
    Download
  • Violation of Honorable SC directions r regarding traffic rules
    Date: 06-11-2013 | 1.28 MB
    Download
  • Deployment of Staff in Various Sections in Depots.
    Date: 29-10-2013 | 1.26 MB
    Download
  • Deployment of staff in various section in the depots
    Date: 29-10-2013 | 1 MB
    Download
  • Road construction between Mubarak Pur Dabas to Sahid Bhagat Singh Colony on temporary basis
    Date: 29-10-2013 | 201.17 KB
    Download
  • Road construction between Mubarak Pur Dabas to Sahid Bhagat Singh Colony on temporary basis
    Date: 29-10-2013 | 201.17 KB
    Download
Top